Skip to main content
A newly installed resinous floor in progress at AT&T Stadium, with construction materials and equipment visible in the background. Text overlay highlights a project showcase.

At Techniquex, we deliver flooring solutions trusted by industry leaders! This weeks spotlight project showcases our refresh at AT&T Stadium, home of the Dallas Cowboys!

This high-profile project has been executed over the past two years to meet the careful demands of a world-class facility. Beyond this refresh, we also have been the sole flooring contractor for the stadium from construction to today.

Systems Used Include: DiamondMetallic & DiamondCrete

Area Covered: 44,644 sq. ft.

Want to learn how we can bring stadium-grade quality to your space?
Contact us at 877-376-9935 and let’s talk about your next project!

 

Side-by-side comparison of a construction site before and after flooring installation, showing bare concrete on the left and finished gray flooring on the right.
Side-by-side comparison of a large indoor floor before and after renovation; the left side shows a bare concrete surface, while the right side shows a finished, smooth gray coating.
Three logos: Techniquex $50 million bond line, AMPP QP 8 polymer coatings contractor, and Made in USA Diamondstone with an American flag.